Inspection reports available upon request.
Pump:
- New hopper grate and vibrator 2/2025
- New wear plate, cutting ring, pressure spring 1/2026
- S-Tube 7/2024
Truck:
- New Engine wiring harness 4/2024
- New EGR Valve 4/2025
- New Air Compressor 4/2024
- New Water pump 4/2024
- New Oil cooler 4/2024
- New Remanned Engine 2/2024
- Complete brake job, wheel bearings and seals 12/2025
- New load pads and torque rods for rear axles 12/2025
- New batteries 10/2025
- Replaced fan clutch 7/2025